Documents Related to Hotel Pier
Documents Related to Hotel Pier
Due to the overwhelming public interest in the department’s efforts to regulate the Red Hill Bulk Fuel Storage Facility (aka, the “Red Hill Facility”), this site will host documents related to those efforts and provide a platform for any member of the public to review and download them. The department intends to continue to make available, and to update as necessary, all records and external communication exchanged between the department and the Navy regarding the operation and maintenance of, and any release responses related to, the Red Hill Facility.
Please note that the Navy has redacted material from these documents to protect critical infrastructure in the interest of national security pursuant to its authority to do so in 10 United Statutes Code (U.S.C.) 130e and to protect personal privacy. If you have any questions or concerns about the redactions, please contact the Navy. The refence to “(b)(3)” where the redactions occur is to 5 U.S.C. 552(b)(3) which is the exemption to the general rule of disclosure in the Federal Of Information Act (“FOIA”) that prohibits disclosure of information otherwise protected by statute. Pursuant to 92F-13(4), Hawaii Revised Statutes, the department is obligated by law not to disclose the redacted material.
Navy Documentation
January 25, 2021 |
|
|
|
|
Hotel 5 History |
|
|
|
Equipment on site 1 25 21 |
|
|
|
Email Requesting More Information |
|
|
|
Hotel.PierHistorical |
|
|
January 27, 2021 |
|
|
|
|
AECOM Sample Map |
|
|
|
Hotel Pier_liquid_JS15_20210114 |
|
|
|
Hotel Pier_liquid_JS38,39,40,41,42,43,44,45_20210114 |
|
|
|
Hotel Pier_solid_JS12,13,17,21,29,32_20210114 |
|
|
|
Hotel Pier_solid_JS23,19,30,22,31_20210114 |
|
|
|
J99919-2 UDS Level 2 Report Final Report |
|
|
|
J100174-1 UDS Level 2 Report Final Report (3) |
|
|
February 1, 2021 |
|
|
|
|
Hotel Pier Fingerprint Analysis Comparison_AECOM |
|
|
|
Fingerprint Results Map |
|
|
|
Hotel Pier UST Removal Report(1997) |
|
|
February 11, 2021 |
|
|
|
|
1757_MaterialsUsed |
|
|
|
Figure from Hotel Pier Final Action Memo – Copy |
|
|
|
Fuel Line Locations from 1997 Ogden RI Rpt (Fnl) Opt – Copy |
|
|
|
Pages from Hotel Pier UST Soil Sample Results – Copy |
|
|
|
Wharf Repair Drawings |
|
|
AECOM Investigation |
|
|
|
|
AECOM Sample Map |
|
|
|
DFT Hotel Pier Plume Delineation |
|
|
|
HotelPier.H1456.Site.Sampling.Location |
|
|
dig.map |
|
|
|
|
dig 4 26 |
|
|
|
Dig.Map.5.4.2021 |
|
|
|
UpdatedDigMapMay5.2021 |
|
|
Excavation March 4 Week |
|
|
|
|
DZ6_6931 |
|
|
|
DZ6_6933 |
|
|
Health & Safety Plan |
|
|
|
|
PENCO – AMC HOTEL PIERS DIVE SAFE PLAN 8 FEB 2021 (2) |
|
|
|
PENCO – HOTEL PIERS H&S SITE PLAN |
|
|
|
AirMonitoringFor.Oil.Spill. |
|
|
PENCO |
|
|
|
|
AECOM Sample Map |
|
|
|
AMC HOTEL PIERS DIVE SAFE PLAN 8 FEB 2021 |
|
|
|
DFT WP Hotel Pier Plume Delineation-v1 |
|
|
|
dig map 2 26 |
|
|
|
FNL WP Hotel Pier PHNSC |
|
|
|
PENCO – Decanting Letter |
|
|
|
PENCO – Decanting Request Letter.Revised |
|
|
|
PENCO – Decanting.Letter.Concur |
|
|
|
PENCO – HOTEL PIERS H&S SITE PLAN |
|
|
|
PENCOEstimates |
|
|
|
PencoFuel.Update |
|
|
|
PencoFuel.Update2 |
|
|
Powerpoint |
|
|
|
|
dig map 2 26 |
|
|
|
HotelPier.TrenchLocation.3.31.21 |
|
|
|
InkedVS3 potential release loca |
|
|
|
R – Pearl Harbor Hotel Pier Release.USCG.Area.Mtg.ppt |
|
|
RAA1 Navy Reports |
|
|
|
|
42nd.HPier.Monitoring.Report |
|
|
|
43AnnualReport.HPier2017 |
|
|
|
43rdAnnualReportHPier |
|
|
|
AECOM Sample Map |
|
|
|
STeve.Mau.MonitoringFrequency |
|
|
SitREP |
|
|
|
|
Dig.Locations.3.18.21 |
|
|
|
INCIDENT STATUS SUMMARY 3 24 21[2867] |
|
|
|
INCIDENT STATUS SUMMARY 4 7 21[2305843009219120911] |
|
|
|
INCIDENT STATUS SUMMARY 4 30 21[2305843009234866616] |
|
|
|
INCIDENT STATUS SUMMARY 5 19 21[2305843009235278005] |
|
|
|
INCIDENT STATUS SUMMARY 6 3 21 |
|
|
|
INCIDENT STATUS SUMMARY 6 16 21 |
|
|
|
INCIDENT STATUS SUMMARY 7 15 21 |
|
|
|
INCIDENT STATUS SUMMARY Hotel Release 3_10_21 |
|
|
|
INCIDENT STATUS SUMMARY 3 17 21 |
|
|
|
INCIDENT STATUS SUMMARY 3 31 21 |
|
|
|
INCIDENT STATUS SUMMARY 4 14 21 |
|
|
|
INCIDENT STATUS SUMMARY 4 23 21[2305843009234681101] |
|
|
|
|
|
|
|
Fingerprint Results plumemap |
|
|
|
H pier recovered qty 2 28 |
|
|
|
J99919-2 UDS Level 2 Report Final Report |
|
|
|
J100174-1 UDS Level 2 Report Final Report (3) |
|
|
|
NavyResponseRelease Jan.2020.H-Pier |
|
|
Navy Critical Infrastructure
UST Release Response
Other Documents