Documents Related to Hotel Pier

Documents Related to Hotel Pier

Due to the overwhelming public interest in the department’s efforts to regulate the Red Hill Bulk Fuel Storage Facility (aka, the “Red Hill Facility”), this site will host documents related to those efforts and provide a platform for any member of the public to review and download them.  The department intends to continue to make available, and to update as necessary, all records and external communication exchanged between the department and the Navy regarding the operation and maintenance of, and any release responses related to, the Red Hill Facility.

Please note that the Navy has redacted material from these documents to protect critical infrastructure in the interest of national security pursuant to its authority to do so in 10 United Statutes Code (U.S.C.) 130e and to protect personal privacy.  If you have any questions or concerns about the redactions, please contact the Navy.  The refence to “(b)(3)” where the redactions occur is to 5 U.S.C. 552(b)(3) which is the exemption to the general rule of disclosure in the Federal Of Information Act (“FOIA”) that prohibits disclosure of information otherwise protected by statute.  Pursuant to 92F-13(4), Hawaii Revised Statutes, the department is obligated by law not to disclose the redacted material.


Navy Documentation

January 25, 2021
Hotel 5 History
Equipment on site 1 25 21
Email Requesting More Information
Hotel.PierHistorical
January 27, 2021
AECOM Sample Map
Hotel Pier_liquid_JS15_20210114
Hotel Pier_liquid_JS38,39,40,41,42,43,44,45_20210114
Hotel Pier_solid_JS12,13,17,21,29,32_20210114
Hotel Pier_solid_JS23,19,30,22,31_20210114
J99919-2 UDS Level 2 Report Final Report
J100174-1 UDS Level 2 Report Final Report (3)
February 1, 2021
Hotel Pier Fingerprint Analysis Comparison_AECOM
Fingerprint Results Map
Hotel Pier UST Removal Report(1997)
February 11, 2021
1757_MaterialsUsed
Figure from Hotel Pier Final Action Memo – Copy
Fuel Line Locations from 1997 Ogden RI Rpt (Fnl) Opt – Copy
Pages from Hotel Pier UST Soil Sample Results – Copy
Wharf Repair Drawings
AECOM Investigation
AECOM Sample Map
DFT Hotel Pier Plume Delineation
HotelPier.H1456.Site.Sampling.Location
dig.map
dig 4 26
Dig.Map.5.4.2021
UpdatedDigMapMay5.2021
Excavation March 4 Week
DZ6_6931
DZ6_6933
Health & Safety Plan
PENCO – AMC HOTEL PIERS DIVE SAFE PLAN 8 FEB 2021 (2)
PENCO – HOTEL PIERS H&S SITE PLAN
AirMonitoringFor.Oil.Spill.
PENCO
AECOM Sample Map
AMC HOTEL PIERS DIVE SAFE PLAN 8 FEB 2021
DFT WP Hotel Pier Plume Delineation-v1
dig map 2 26
FNL WP Hotel Pier PHNSC
PENCO – Decanting Letter
PENCO – Decanting Request Letter.Revised
PENCO – Decanting.Letter.Concur
PENCO – HOTEL PIERS H&S SITE PLAN
PENCOEstimates
PencoFuel.Update
PencoFuel.Update2
Powerpoint
dig map 2 26
HotelPier.TrenchLocation.3.31.21
InkedVS3 potential release loca
R – Pearl Harbor Hotel Pier Release.USCG.Area.Mtg.ppt
RAA1 Navy Reports
42nd.HPier.Monitoring.Report
43AnnualReport.HPier2017
43rdAnnualReportHPier
AECOM Sample Map
STeve.Mau.MonitoringFrequency
SitREP
Dig.Locations.3.18.21
INCIDENT STATUS SUMMARY 3 24 21[2867]
INCIDENT STATUS SUMMARY 4 7 21[2305843009219120911]
INCIDENT STATUS SUMMARY 4 30 21[2305843009234866616]
INCIDENT STATUS SUMMARY 5 19 21[2305843009235278005]
INCIDENT STATUS SUMMARY 6 3 21
INCIDENT STATUS SUMMARY 6 16 21
INCIDENT STATUS SUMMARY 7 15 21
INCIDENT STATUS SUMMARY Hotel Release 3_10_21
INCIDENT STATUS SUMMARY 3 17 21
INCIDENT STATUS SUMMARY 3 31 21
INCIDENT STATUS SUMMARY 4 14 21
INCIDENT STATUS SUMMARY 4 23 21[2305843009234681101]
Fingerprint Results plumemap
H pier recovered qty 2 28
J99919-2 UDS Level 2 Report Final Report
J100174-1 UDS Level 2 Report Final Report (3)
NavyResponseRelease Jan.2020.H-Pier

Navy Critical Infrastructure

Navy.Response.NOI.Release of HS at H-Pier[1585]
VS3 potential release location
VS3 Release location.Manifold

UST Release Response

LOCKED – Red Hill Hotel Pier CONFIRMED RELEASE Letter 2021-06-25 edit (part 1) – signed
2021 08 02 email inital abatement mea, site assessment
2021 08 02 Hotel Pier – initial abatement and site assessment
2021 08 26 email Navy request for extension for 4 rpts H, K Pier
2021 09 10 email free Product Removal rept
2021 09 10 email Initial site characterization rept
Fuel Water Level Hotel Pier 20210921
H Pier 9-21 Visit

Other Documents

2019 03 14 REDACTED -JBPHH – 2019 Annual LD Testing of 35 Sections (xxxxx Feet) of Petroleum Pipelines
2019 08 13 REDACTED -JBPHH – 2019 One-time SLPT of Four Sections (xxxxx Feet) of Pier Pipelines
2020 03 06 REDACTED – JB Pearl Harbor-Hickam HI – 2020 Annual LD Testing of Pipelines
2020 08 27 REDACTED – JB Pearl Harbor-Hickam HI – 2020 Annual SLPT Report
2020 11 30 REDACTED – JB Pearl Harbor-Hickam HI – 2020 One-time SLPT Report
2021 02 16 REDACTED – JBPHH – 2021 One-time Bulk Pipeline Leak Detection Testing Report
2021 07 14 email CRN notice
INCIDENT STATUS SUMMARY 3 17 21
INCIDENT STATUS SUMMARY 3 24 21
INCIDENT STATUS SUMMARY 3 31 21
INCIDENT STATUS SUMMARY 4 7 21
INCIDENT STATUS SUMMARY 4 14 21
INCIDENT STATUS SUMMARY 4 23 21
INCIDENT STATUS SUMMARY 4 30 21
INCIDENT STATUS SUMMARY 5 19 21
INCIDENT STATUS SUMMARY 6 3 21
INCIDENT STATUS SUMMARY 6 16 21
INCIDENT STATUS SUMMARY 8 13 21 final
INCIDENT STATUS SUMMARY Hotel Release 3_10_21
media126045-N62742-12-D-1852 CTO 0002 RAA-1 43RD ANNUAL REPORT – FINAL Feb 2017
Navy.Response.NOI
Navy.Response.NOI.Release of HS at H-Pier[1585]
Written Report Upload Form
Written Report