Documents Related to Hotel Pier

Due to the overwhelming public interest in the department’s efforts to regulate the Red Hill Bulk Fuel Storage Facility (aka, the “Red Hill Facility”), this site will host documents related to those efforts and provide a platform for any member of the public to review and download them.  The department intends to continue to make available, and to update as necessary, all records and external communication exchanged between the department and the Navy regarding the operation and maintenance of, and any release responses related to, the Red Hill Facility.

Please note that the Navy has redacted material from these documents to protect critical infrastructure in the interest of national security pursuant to its authority to do so in 10 United Statutes Code (U.S.C.) 130e and to protect personal privacy.  If you have any questions or concerns about the redactions, please contact the Navy.  The refence to “(b)(3)” where the redactions occur is to 5 U.S.C. 552(b)(3) which is the exemption to the general rule of disclosure in the Federal Of Information Act (“FOIA”) that prohibits disclosure of information otherwise protected by statute.  Pursuant to 92F-13(4), Hawaii Revised Statutes, the department is obligated by law not to disclose the redacted material.


Navy Documentation

January 25, 2021
Hotel 5 History (PDF, opens in new tab)
Equipment on site 1 25 21 (PDF, opens in new tab)
Email Requesting More Information (PDF, opens in new tab)
Hotel.PierHistorical (PDF, opens in new tab)
January 27, 2021
AECOM Sample Map (PDF, opens in new tab)
Hotel Pier_liquid_JS15_20210114 (PDF, opens in new tab)
Hotel Pier_liquid_JS38,39,40,41,42,43,44,45_20210114 (PDF, opens in new tab)
Hotel Pier_solid_JS12,13,17,21,29,32_20210114 (PDF, opens in new tab)
Hotel Pier_solid_JS23,19,30,22,31_20210114 (PDF, opens in new tab)
J99919-2 UDS Level 2 Report Final Report (PDF, opens in new tab)
J100174-1 UDS Level 2 Report Final Report (3) (PDF, opens in new tab)
February 1, 2021
Hotel Pier Fingerprint Analysis Comparison_AECOM (Excel)
Fingerprint Results Map (PDF, opens in new tab)
Hotel Pier UST Removal Report(1997) (PDF, opens in new tab)
February 11, 2021
1757_MaterialsUsed (PDF, opens in new tab)
Figure from Hotel Pier Final Action Memo – Copy (PDF, opens in new tab)
Fuel Line Locations from 1997 Ogden RI Rpt (Fnl) Opt – Copy (PDF, opens in new tab)
Pages from Hotel Pier UST Soil Sample Results – Copy (PDF, opens in new tab)
Wharf Repair Drawings (PDF, opens in new tab)
AECOM Investigation
AECOM Sample Map (PDF, opens in new tab)
DFT Hotel Pier Plume Delineation (PDF, opens in new tab)
HotelPier.H1456.Site.Sampling.Location (PDF, opens in new tab)
dig.map
dig 4 26 (PDF, opens in new tab)
Dig.Map.5.4.2021 (PDF, opens in new tab)
UpdatedDigMapMay5.2021 (PDF, opens in new tab)
Excavation March 4 Week
DZ6_6931 (PDF, opens in new tab)
DZ6_6933 (PDF, opens in new tab)
Health & Safety Plan
PENCO – AMC HOTEL PIERS DIVE SAFE PLAN 8 FEB 2021 (2) (PDF, opens in new tab)
PENCO – HOTEL PIERS H&S SITE PLAN (PDF, opens in new tab)
AirMonitoringFor.Oil.Spill. (PDF, opens in new tab)
PENCO
AECOM Sample Map (PDF, opens in new tab)
AMC HOTEL PIERS DIVE SAFE PLAN 8 FEB 2021 (PDF, opens in new tab)
DFT WP Hotel Pier Plume Delineation-v1 (PDF, opens in new tab)
dig map 2 26 (PDF, opens in new tab)
FNL WP Hotel Pier PHNSC (PDF, opens in new tab)
PENCO – Decanting Letter (PDF, opens in new tab)
PENCO – Decanting Request Letter.Revised (PDF, opens in new tab)
PENCO – Decanting.Letter.Concur (PDF, opens in new tab)
PENCO – HOTEL PIERS H&S SITE PLAN (PDF, opens in new tab)
PENCOEstimates (PDF, opens in new tab)
PencoFuel.Update (PDF, opens in new tab)
PencoFuel.Update2 (PDF, opens in new tab)
Powerpoint
dig map 2 26 (PDF, opens in new tab)
HotelPier.TrenchLocation.3.31.21 (PDF, opens in new tab)
InkedVS3 potential release loca (PDF, opens in new tab)
R – Pearl Harbor Hotel Pier Release.USCG.Area.Mtg.ppt (PDF, opens in new tab)
RAA1 Navy Reports
42nd.HPier.Monitoring.Report (PDF, opens in new tab)
43AnnualReport.HPier2017 (PDF, opens in new tab)
43rdAnnualReportHPier (PDF, opens in new tab)
AECOM Sample Map (PDF, opens in new tab)
STeve.Mau.MonitoringFrequency (PDF, opens in new tab)
SitREP
Dig.Locations.3.18.21 (PDF, opens in new tab)
INCIDENT STATUS SUMMARY 3 24 21[2867] (PDF, opens in new tab)
INCIDENT STATUS SUMMARY 4 7 21[2305843009219120911] (PDF, opens in new tab)
INCIDENT STATUS SUMMARY 4 30 21[2305843009234866616] (PDF, opens in new tab)
INCIDENT STATUS SUMMARY 5 19 21[2305843009235278005] (PDF, opens in new tab)
INCIDENT STATUS SUMMARY 6 3 21 (PDF, opens in new tab)
INCIDENT STATUS SUMMARY 6 16 21 (PDF, opens in new tab)
INCIDENT STATUS SUMMARY 7 15 21 (PDF, opens in new tab)
INCIDENT STATUS SUMMARY Hotel Release 3_10_21 (PDF, opens in new tab)
INCIDENT STATUS SUMMARY 3 17 21 (PDF, opens in new tab)
INCIDENT STATUS SUMMARY 3 31 21 (PDF, opens in new tab)
INCIDENT STATUS SUMMARY 4 14 21 (PDF, opens in new tab)
INCIDENT STATUS SUMMARY 4 23 21[2305843009234681101] (PDF, opens in new tab)
Fingerprint Results plumemap (PDF, opens in new tab)
H pier recovered qty 2 28 (PDF, opens in new tab)
J99919-2 UDS Level 2 Report Final Report (PDF, opens in new tab)
J100174-1 UDS Level 2 Report Final Report (3) (PDF, opens in new tab)
NavyResponseRelease Jan.2020.H-Pier (PDF, opens in new tab)

Navy Critical Infrastructure

Navy.Response.NOI.Release of HS at H-Pier[1585] (PDF, opens in new tab)
VS3 potential release location (PDF, opens in new tab)
VS3 Release location.Manifold (PDF, opens in new tab)

UST Release Response

LOCKED – Red Hill Hotel Pier CONFIRMED RELEASE Letter 2021-06-25 edit (part 1) – signed (PDF, opens in new tab)

2021 08 02 email inital abatement mea, site assessment (PDF, opens in new tab)

2021 08 02 Hotel Pier – initial abatement and site assessment (PDF, opens in new tab)

2021 08 26 email Navy request for extension for 4 rpts H, K Pier (PDF, opens in new tab)

2021 09 10 email free Product Removal rept (PDF, opens in new tab)

2021 09 10 email Initial site characterization rept (PDF, opens in new tab)

Fuel Water Level Hotel Pier 20210921 (PDF, opens in new tab)

H Pier 9-21 Visit (PDF, opens in new tab)

2022 01 10 qtr rel resp rept (PDF, opens in new tab)

2022 04 18 Qtr Rel resp rept (PDF, opens in new tab)

2022 07 18 Quarter release response rept (PDF, opens in new tab)

2022 10 07 qtr release resp rept and cover ltr (PDF, opens in new tab)

2023 01 06 Qtr release resp rept (PDF, opens in new tab)

2023 03 07 qtr rel resp (PDF, opens in new tab)

2023 06 05 QtrlyRRR (PDF, opens in new tab)

2023 10 03 Qtr rel resp rept (PDF, opens in new tab)

2024 01 02 QtrlyRRR (PDF, opens in new tab)

2024 03 qtrly rel resp rept (PDF, opens in new tab)

2024 06 Quarterly Release Response Report (PDF, opens in new tab)

2024 09 qtr rel resp rept (PDF, opens in new tab)

2024 12 qtr rel resp rept (PDF, opens in new tab)

2025 02 qtr release resp rept (PDF, opens in new tab)

Other Documents

2019 03 14 REDACTED -JBPHH – 2019 Annual LD Testing of 35 Sections (xxxxx Feet) of Petroleum Pipelines (PDF, opens in new tab)
2019 08 13 REDACTED -JBPHH – 2019 One-time SLPT of Four Sections (xxxxx Feet) of Pier Pipelines (PDF, opens in new tab)
2020 03 06 REDACTED – JB Pearl Harbor-Hickam HI – 2020 Annual LD Testing of Pipelines (PDF, opens in new tab)
2020 08 27 REDACTED – JB Pearl Harbor-Hickam HI – 2020 Annual SLPT Report (PDF, opens in new tab)
2020 11 30 REDACTED – JB Pearl Harbor-Hickam HI – 2020 One-time SLPT Report (PDF, opens in new tab)
2021 02 16 REDACTED – JBPHH – 2021 One-time Bulk Pipeline Leak Detection Testing Report (PDF, opens in new tab)
2021 07 14 email CRN notice (PDF, opens in new tab)
INCIDENT STATUS SUMMARY 3 17 21 (PDF, opens in new tab)
INCIDENT STATUS SUMMARY 3 24 21 (PDF, opens in new tab)
INCIDENT STATUS SUMMARY 3 31 21 (PDF, opens in new tab)
INCIDENT STATUS SUMMARY 4 7 21 (PDF, opens in new tab)
INCIDENT STATUS SUMMARY 4 14 21 (PDF, opens in new tab)
INCIDENT STATUS SUMMARY 4 23 21 (PDF, opens in new tab)
INCIDENT STATUS SUMMARY 4 30 21 (PDF, opens in new tab)
INCIDENT STATUS SUMMARY 5 19 21 (PDF, opens in new tab)
INCIDENT STATUS SUMMARY 6 3 21 (PDF, opens in new tab)
INCIDENT STATUS SUMMARY 6 16 21 (PDF, opens in new tab)
INCIDENT STATUS SUMMARY 8 13 21 final (PDF, opens in new tab)
INCIDENT STATUS SUMMARY Hotel Release 3_10_21 (PDF, opens in new tab)
media126045-N62742-12-D-1852 CTO 0002 RAA-1 43RD ANNUAL REPORT – FINAL Feb 2017 (PDF, opens in new tab)
Navy.Response.NOI (PDF, opens in new tab)
Navy.Response.NOI.Release of HS at H-Pier[1585] (PDF, opens in new tab)
Written Report Upload Form (PDF, opens in new tab)
Written Report (PDF, opens in new tab)