Kinau Hale Standby Generator Information

UPDATE 06/21/2022

Wasa Electric will begin drilling on the exterior Mauka walls of the Kinau Hale building starting tomorrow from 6:30am to 8:00am. There will be noise from the drilling.

What is being done?
DOCD will be installing a backup generator to support its refrigeration units that store the vaccine supply at Kinau Hale.

When does this start?
Electrical work will begin on Monday June 20th at 7am

What will be done and how does it affect me?
The electrical contractor, Wasa Electric, will be drilling anchors into the concrete of the building, coring, and doing abatement, which will generate noise. The work will mainly occur on the Mauka side of the building.

What is abatement and how does it affect me?
The contractor will need to close off some of the corridors based on contaminent findings. We will keep you posted.

The Schedule

Kinau Hale Standby Generator Schedule

 

If you have any questions please email [email protected]