Public Notice Documents – Kekaha MSW Landfill Renewal and Modification Draft Permit

Kekaha Landfill Draft Permit LF-0042-23

October 11, 2023 Permit Modification Application, Kekaha Landfill

December 1, 2023 Permit Application Renewal and Modification, Height Increase

December 16, 2024 Permit Modification Request Daily Tonnage Increase, Kekaha Landfill

February 13, 2024 Final Environmental Assessment and Finding of No Significant Impact for Kekaha Municipal Landfill Phase II Vertical Expansion-Phase-II-Vertical-Expansion

November 2023 Attachment P-3.2 Engineering Report, Kekaha Landfill

November 2023 Attachment P-3.3 Operations Manual November 2023, Kekaha Landfill
The operations plan includes various other operational plans such as the leachate management plan, perimeter gas monitoring plan, subsurface landfill gas temperature monitoring and contingency plan, and closure/post-closure plan

February 20, 2023 Attachment P-4 Closure Post Closure Maintenance Plan

August 30, 2024 Surface Water Management Plan, Kekaha Landfill

October 2018 Cell 2 Base Liner Drawings

October 2017 Engineering Report, Cell 2 Lateral Expansion

April 14, 2016 Construction Quality Assurance, Phase II Leachate Management Systems Modifications, Kekaha Landfill

March 20, 2015 Kekaha Summary of the Second Phase II Liner Investigation

August 2013 Revised Groundwater Monitoring Plan, Phase II, Kekaha Landfill

May 25, 2010 Construction Quality Assurance Report Cell 1 (1A through 1D)

January 2009 Engineering Report, Cell 1

January 2009 Engineering Report, Cell 1, Drawings

March 1993 Leachate Collection System Drawing