Update: May 6 and Nov 20 NOI Release Monitoring Data

Posted on Jan 28, 2026 in Red Hill Bulk Fuel Storage Facility

Data obtained from the Navy updated   

NOI sampling results:

Soil Vapor Monitoring

  • Cumulative Soil Vapor Monitoring Results for Tanks 13 JAN 2026
  • Data table (Received on 2/21/22 posted on 2/22/22)
    • ADIT 3 Soil Vapor Results & Rain Gauge –21 OCT 25 
    • SVMP Field Notes 13 JAN 2026 
    • Summa Canister Sampling
      • No updates

Monitoring Well Headspace PID Readings and Fuel Product Gauging

  • Cumulative SVMP PID Readings 13 JAN 2026
  • Cumulative Headspace PID and Gauging 09 JAN 26
    • Groundwater sampling field parameters are included in a third tab
  • ADIT 3 – Cumulative SVMP PID Readings 30 DEC 25
  • Free Product Monitoring Photos 09 JAN 26
  • Cumulative Oil Water Interface – 17 JUN 2025  

Red Hill Shaft Gauging20 AUG 24

May 6 and Nov 20 2021 Cumulative Groundwater Data Table 09 JAN 26

Final Cumulative Groundwater Data Table Tabulated 09 JAN 26