Update: May 6 and Nov 20 NOI Release Monitoring Data

Posted on Sep 16, 2025 in Red Hill Bulk Fuel Storage Facility

Data obtained from the Navy updated   

NOI sampling results:

Soil Vapor Monitoring

  • Cumulative Soil Vapor Monitoring Results for Tanks –  09 SEP 2025
  • Data table (Received on 2/21/22 posted on 2/22/22)
    • ADIT 3 Soil Vapor Results & Rain Gauge – 29 DEC 23 
    • SVMP Field Notes 02 SEP 2025 
    • Summa Canister Sampling
      • No updates

Monitoring Well Headspace PID Readings and Fuel Product Gauging

  • Cumulative SVMP PID Readings 09 SEP 2025
  • Cumulative Headspace PID and Gauging 05 SEP25
    • Groundwater sampling field parameters are included in a third tab
  • ADIT 3 – Cumulative SVMP PID Readings – 29 JULY 25
  • Free Product Monitoring Photos – 05 SEP 25
  • Cumulative Oil Water Interface – 17 JUN 2025  

Red Hill Shaft Gauging20 AUG 24

May 6 and Nov 20 2021 Cumulative Groundwater Data Table 05 SEP 25

Final Cumulative Groundwater Data Table Tabulated 05 SEP 25