Update: May 6 and Nov 20 NOI Release Monitoring Data
Posted on Jun 25, 2024 in Red Hill Bulk Fuel Storage Facility
-
May 6 and Nov 20 2021 Cumulative Groundwater Data Table – 08 APR 24
-
NOI sampling results:
Soil Vapor Monitoring
- Cumulative Soil Vapor Monitoring Results for Tanks – 13 FEB 24
- Data table (Received on 2/21/22 posted on 2/22/22)
-
ADIT 3 Soil Vapor Results & Rain Gauge –29 DEC 23
-
-
umma Canister Sampling
Monitoring Well Headspace PID Readings and Fuel Product Gauging
-
Cumulative SVMP PID Readings – 11 JUNE 24
-
Cumulative Headspace PID and Gauging – 14 JUNE 24
-
Groundwater sampling field parameters are included in a third tab
-
ADIT 3 – Cumulative SVMP PID Readings- 17 MAY 24
-
Free Product Monitoring Photos – 14 JUNE 24
- Cumulative Oil Water Int – 23 APR 24
Red Hill Shaft Gauging – 19 JUNE 24
May 6 and Nov 20 2021 Cumulative Groundwater Data Table – 14 JUNE 24
Final Cumulative Groundwater Data Table Tabulated – 14 JUNE 24