Update: May 6 and Nov 20 NOI Release Monitoring Data

Posted on May 19, 2025 in Red Hill Bulk Fuel Storage Facility

Data obtained from the Navy updated    Map of Sample Locations

NOI sampling results:

Soil Vapor Monitoring

  • Cumulative Soil Vapor Monitoring Results for Tanks – 13 FEB 24
  • Data table (Received on 2/21/22 posted on 2/22/22)
    • ADIT 3 Soil Vapor Results & Rain Gauge – 29 DEC 23

    • SVMP Field Notes – 13 MAY 25

    • Summa Canister Sampling

      • No updates

Monitoring Well Headspace PID Readings and Fuel Product Gauging

  • Cumulative SVMP PID Readings – 13 MAY 25

  • Cumulative Headspace PID and Gauging – 02 MAY 25

    • Groundwater sampling field parameters are included in a third tab

  • ADIT 3 – Cumulative SVMP PID Readings – 25 APR 25

  • Free Product Monitoring Photos –02 MAY 25

  • Cumulative Oil Water Interface 18 MAR 25

Red Hill Shaft Gauging20 AUG 24

May 6 and Nov 20 2021 Cumulative Groundwater Data Table09 MAY 25

Final Cumulative Groundwater Data Table Tabulated 09 MAY 25