Update: May 6 and Nov 20 NOI Release Monitoring Data

Posted on May 29, 2026 in Red Hill Bulk Fuel Storage Facility

Data obtained from the Navy updated   

NOI sampling results:

Soil Vapor Monitoring

  • Cumulative Soil Vapor Monitoring Results for Tanks 5 MAY 2026
  • Data table (Received on 2/21/22 posted on 2/22/22)
    • ADIT 3 Soil Vapor Results & Rain Gauge –13 APR 26 
    • SVMP Field Notes 12 MAY 2026
    • Summa Canister Sampling
      • No updates

Monitoring Well Headspace PID Readings and Fuel Product Gauging

  • Cumulative SVMP PID Readings 05 MAY 2026
  • Cumulative Headspace PID and Gauging 01 MAY 26
    • Groundwater sampling field parameters are included in a third tab
  • ADIT 3 – Cumulative SVMP PID Readings 13 APR 26
  • Free Product Monitoring Photos 01 MAY 26
  • Cumulative Oil Water Interface – 19  AUG 2025 

Red Hill Shaft Gauging20 AUG 24

May 6 and Nov 20 2021 Cumulative Groundwater Data Table 01 MAY 26

Final Cumulative Groundwater Data Table Tabulated 27 MAR 26